El-Salam Bridge

El-Salam Bridge

Suez Canal suspended cable bridge over Suez canal. Repairing the deck surface of the steel bridge by covering it with Epoxy layers. Under the supervision of the Arab Consulting Engineers (ACE) office "Moharam Bakhoum" from Egypt joining with Japan International Cooperation Agency (JICA) from Japan. Painting the deck surface with anti-corrosive Epoxy "Polypoxy 730-CH". Covering the deck surface with elastic Epoxy "PolyPoxy 775-T".